Customization: | Available |
---|---|
Application: | Construction, Mineral Industry, Stone Industry |
Drive: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
operation video:
https://prodrill.en.made-in-china.com
I. Technical part
(1) The rock demo proposal design's characteristics: pertinence,advanced technology and strong applicability.
(2) Use the monitoring system and information feedback system to guide the construction.
(3) All kinds of technical problems are advanced in research and prevention.
(4) Strictly implement the relevant requirements of the administrative department of every country on the safety, quality, civilization, and environmental protection of the project construction, minimize the impact on the lives of citizens, and establish a good engineering image and social image.
II.Construction environment
The rock demolition project belongs to living area.There are houses,roads, and other facilities on the surrounding site, which must take into account the safety of buildings, gas pipelines, personnel, and roads.
III.Engineering geological conditions
According to the on-site situation that is described by Mr.Pino, the site may can be referred to as Andesite quarry , and its hardness reaches 400 Mpa ( HRC 4 ) .The project is shown below, in our eyes, not very hard rock , soft, low abrasive rock from and condition. Easy to fracture by Co2 gas cutting way.
IV.Analysis of engineering geological conditions on construction
Construction principle
For the demolition project of Andesite quarry, in order to ensure the smooth progress of the project, for the existing rock to be taken:
1. combined CO2 carbon dioxide gas expansion and cracking;
2. blind cutting method by quarry saw;
3. strong diamond wire saw;
4. Expansive mortar soundless cracking.
Through the geology of the exploration at first, the rock is drilled through the geological drilling rig (hydraulic rock drill or down-the-hole DTH drill) in the place where the Andesite / Limestone exists, and then the rock is expanded by gas expansion and blasting. The construction method has been applied to the demo project of many projects inChina city like Shenzhen, Yunnan, Hubei, Gansu, etc., and proved to be a scientific, reasonable and effective rock demo method.
CO2 Gas Expansion can be described as these steps:Drilling;Fill tube; Backfill;Filling gas;connection fume;Warning withdral;detonation;
V. How to use CO2 fracture machine :
1. Drilling: Drilling with a submerged hole drill or a hydraulic rock drill, hitting 141MM holes, drilling holes of 3 meters to 6 meters and spacing, the depth is 10 meters, depending on the rock adjustment. 121 mm diameter for cracking pipes , length 1100 mm. 10 kg Co2 load capacity;
2. After drilling the hole, connect the installed cracking tube to the air tube and wire into the bottom of the hole;
3. Use quick-drying cement or drilled stone powder slag to fill the hole and tighten it;
4. connect the inflatable tube to start to inflate, inflate to 8/9Mpa, automatically stop, refill the second, and then fill all the tubes in turn;
5. Connect the detonating line of all tubes to the detonator;
6. Clearing the blasting site , everyone withdraws from the scene;
7. start the detonation switch;
According to CONBLOC INFRATECNO requirement of 4,000 cubic meters per day, 67 cubic meters of stones may be produced from each pipe. 67 holes need to be drilled at a depth of 670 meters per day. 50 dollars a piece, 50 dollars a 10-meter hole,
67* $50 out of 4,000 cubic metres,$1.19 per cubic metre. This is reference as for your file.
In summary, the CO2 carbon dioxide gas expansion cracking construction process and expansion, splitter relative to explosives are much more complicated, and also need more auxiliary protective equipment, technically strong and also have certain risks, must strictly abide by the operating procedures,
VI.Construction organization
The project established CO2 a carbon dioxide expansion and cracking command organization responsible for the progress, quality and safety of the project.
(1) Technical person in charge:
(2) person in charge of security:
(3) the blaster:
(4) manager administrator:
(5) security staff:
The principle of gas expansion and cracking is that the CO2 gas can be converted into a liquid state under a certain high pressure. When the micro current passes through the high heat conduction, a high temperature breakdown safety film is generated, and the liquid CO2 is vaporized instantaneously, and the high pressure impact is generated by the rapid expansion. Or the deposit is rapidly pushed outward by the geometric-grade equivalent shock wave, which takes only 0.4 seconds from the initiation to the end of the whole process, and runs at low temperature; the blasting process is the process of volume expansion, no shock wave, no vibration wave, no explosion wave,is physical work rather than chemical reaction.
It can be said that the gas expansion and cracking use CO2 physics to do work, is an efficient, energy-saving, green and environmentally-friendly excavation artifact, and will certainly have a broad market prospect in field of rock demolition, quarrying and construction project.
VII. QUOTATION & CONSUMPTION COST.
1,Price : $22,000/set FOB Xiamen , Indonesia Including Gas Filler, Gas Storage Tank (500 kg ), heater insider of casing, guide air hose,connector in full set, not including Cracking Pipe /Casing.
2, Cracking Pipe : 50$/pc , Assuming 4000 cbm, need 67 pcs cracking pipe.
According to CONBLOC INFRATECNO requirement of 4,000 cubic meters per day, 67 cubic meters of stones may be produced from each pipe. 67 holes need to be drilled at a depth of 670 meters per day. 50 dollars a piece, 50 dollars a 10-meter hole,
67* $50 out of 4,000 cubic meter, $1.19 per cubic metre.
3. Gas Storage Tank ( 500 kg ) : $6999.00 / unit if you need one more
4. Payment term : 30% TT in advance, and 70% Upon the B/L copy.
5. Delivery term : within 30 days after receiving down-payment, before shipment.
6. Logo : by OEM, or CONBLOC INFRATECNO
Type(outer diameter) | Punch diameter | CO2 Aeration amount(kg) | length(m) |
36 | 40 | 1 | 1.2 |
52 | <65 | 1 | 0.7 |
2 | 1.2 | ||
76 | 90 | 2 | 0.7 |
3 | 1 | ||
5 | 1.6 | ||
98 | 115 | 2 | 0.4 |
3 | 0.7 | ||
5 | 1 |
Photo of main and spare parts .
Gas cracking filling machine:
Gas Storage Tank:
Gas cracking pipe, 121 mm dia , 1.1 meter in length:
Technical Service :
Free charge to train buyer technical staff 1-2 persons, come to China with a help of Visa, Supplier take care dinner, Car, hotel etc in work site, time of train Max 7 days. If buyer need supplier technician to visit buyer project without quality problem, buyer need to bear air ticket and hotel and dinner etc.
If you have interesting about this production,just feel free to contact with me +8613599538894