Prodrill hydraulic rock /concrete splitter is a machine which is used in mining work of construction stones, the secondary breaking of large rocks and the partial or integral removing concrete facilities. It can split the objects into many pieces in the natural cleft surface.Advantages:
PD Piston Rock Splitter Technical Parameter
Model No. | Hole dia. | Drilling depth mm |
Splitting power Ton/pcs |
Weight KG/pcs |
Working pressure MPa |
Space distance mm |
Power Source |
PD-90 | 90 | >1000 | 260 | 32 | 120 | 500-700 | Diesel enginel/ Electric motor |
PD-102 | 102 | >1000 | 305 | 41 | 100-120 | 500-900 | Diesel enginel/ Electric motor |
PD-110 | 110 | >1000 | 411 | 47 | 100-120 | 500-1000 | Diesel enginel/ Electric motor |
PD-115 | 115 | >1000 | 420 | 57 | 100-120 | 500-1500 | Diesel enginel/ Electric motor |
PD-130 | 130 | >1000 | 520 | 80 | 100-120 | 500-2000 | Diesel enginel/ Electric motor |
PD-150 | 152 | >1000 | 600 | 100 | 100-120 | 500-2300 | Diesel enginel/ Electric motor |
PD-180 | 184 | >1000 | 780 | 168 | 100-120 | 800-3000 | Diesel enginel/ Electric motor |
All kinds of natural stones, rock, granite, marble mining & quarrying
Machine bases fracture
Bridge columns demolition
Reinforced concrete structures removal
Mass foundations splitting
Controlled demolition of pillars, concrete and walls where heavy equipment is impractical
Staircase removal
Premises that may be in continual use such as hospitals, factories, offices and hotels
removing redundant reinforced concrete structures, concrete machine beds and plinths, mass filled concrete etc.
Underwater demolition
Demolition in a restricted space
Tunnel work
Trench excavation